Bhuji Khola Hydroelectric Project

Project Overview
The Bhuji Khola Hydroelectric Project is a high-efficiency Run-of-River (ROR) hydropower project located in the Dhorpatan Municipality, Burtibang, Baglung. Harnessing the power of the Bhuji Khola, this project is designed to generate significant clean energy for the national grid.
The project features a diversion weir of 44.0m length and 6.0m height, with a headrace pipe spanning 2460m. The electromechanical system consists of two units of Horizontal Shaft Francis Turbines, each with a capacity of 3.98 MW.
Technical Highlights
Diversion Weir
44.0 m length, Concrete Free Overflow
Gross Head
180.0 m
Headrace Pipe
2460 m length, 1.80 m Diameter
Power House
Surface type (21m x 9m x 9m)
Transmission
33 kV 3-phase line (7.50 Km)
River Basin
Badigad River Basin
Salient Features
Installed Capacity
7.96 MW
Location
Baglung, Gandaki
Annual Energy
40.71 GWh
Project Cost
NRs. 990.08 million
Payback Period
8.18 Years
Design Flow
5.42 m³/s
"Driving economic growth and promoting sustainability through absolute energy self-sufficiency."