Bhuji Khola Hydroelectric Project

Bhuji Khola Hydroelectric Project

Project Overview

The Bhuji Khola Hydroelectric Project is a high-efficiency Run-of-River (ROR) hydropower project located in the Dhorpatan Municipality, Burtibang, Baglung. Harnessing the power of the Bhuji Khola, this project is designed to generate significant clean energy for the national grid.

The project features a diversion weir of 44.0m length and 6.0m height, with a headrace pipe spanning 2460m. The electromechanical system consists of two units of Horizontal Shaft Francis Turbines, each with a capacity of 3.98 MW.

Technical Highlights

Diversion Weir

44.0 m length, Concrete Free Overflow

Gross Head

180.0 m

Headrace Pipe

2460 m length, 1.80 m Diameter

Power House

Surface type (21m x 9m x 9m)

Transmission

33 kV 3-phase line (7.50 Km)

River Basin

Badigad River Basin

Salient Features

Installed Capacity

7.96 MW

Location

Baglung, Gandaki

Annual Energy

40.71 GWh

Project Cost

NRs. 990.08 million

Payback Period

8.18 Years

Design Flow

5.42 m³/s

"Driving economic growth and promoting sustainability through absolute energy self-sufficiency."